Raychem QuickStat Manual de instalación Pagina 6

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 8
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 5
QuickNet-RK Installation Instructions
6
Cut ground jumper to length, allowing 1/2" overlap on each end
of twisted grounding wire.
Slide SolderSleeve connectors onto ground wires and jumper.
Heat SolderSleeve connectors until solder has melted. Before and after re-installing the mortar and tile run the three
standard QuickNet commissioning tests from the cold lead
wire at the QuickStat Thermostat and record the results in the
commissioning log.
Continue the QuickNet System installation following the
QuickNet and QuickStat Installation manuals.
27 28
29 30
1/2"
1/2"
Center the 4 black heat-shrinkable tubes over the installed
SolderSleeve connectors.
Using the heat gun, shrink in place.
26
Heat SolderSleeve connectors until solder and adhesive have
melted.
Allow to cool, then repeat for second jumper wire.
25
Vista de pagina 5
1 2 3 4 5 6 7 8

Comentarios a estos manuales

Sin comentarios